Complete Construction Solutions by WINCON

 

Design and Build

Design-build construction offers a highly efficient approach to managing your project. Our design-build services start well before construction, with thorough pre-construction design and planning. We take pride in delivering turnkey commercial construction solutions from start to finish, tailoring our services to meet your specific needs and maximize project value. With years of experience, our innovative team ensures your construction project is set up for success.

Our Design Build Pre-Construction Services Include

Scope of Work

WINCON will release a detailed document that outlines all the tasks, deliverables, and responsibilities required to complete a project. In construction, it serves as a guide to ensure that all parties involved understand what needs to be done, how it will be accomplished, and the standards that must be met. A well-defined scope of work typically includes:

  1. Project Overview: A clear description of the project, including objectives and goals.
  2. Work Tasks: A detailed list of tasks or activities that need to be performed.
  3. Deliverables: Specific outputs or end products expected from the tasks.
  4. Timeline and Milestones: Deadlines for each task or project phase, including key milestones.
  5. Roles and Responsibilities: Identification of who is responsible for each task or deliverable.
  6. Materials and Equipment: Details on the materials, equipment, or services required for the project.
  7. Quality Standards: Specifications, regulations, or standards that must be adhered to.
  8. Assumptions and Constraints: Any assumptions made while planning the scope, as well as any project limitations.

The scope of work ensures clarity between the client, contractor, and other stakeholders, reducing misunderstandings and helping to keep the project on track.

Staging & Scheduling

At Wincon, staging and scheduling are critical components of our construction project management process, ensuring that work progresses efficiently and on time.

  1. Staging:

    Wincon strategically organizes and prepares the construction site and materials to ensure smooth task execution. This involves:

    1. Site Setup: Organizing equipment, tools, and materials to minimize delays and maximize efficiency.
    2. Material Delivery: Planning the timely arrival of materials to prevent shortages or excessive stockpiling.
    3. Access Routes: Creating clear pathways for equipment, workers, and deliveries to avoid congestion and delays.
    4. Phased Work Areas: Defining and preparing different sections of the project site so work can be completed in stages without causing disruption.

  2. Scheduling:

    At Wincon, we meticulously plan the timing of project activities to ensure tasks are completed logically and within the project’s timeframe. Key aspects include:

    1. Timeline Development: Creating a project timeline with clear deadlines for each phase or task.
    2. Resource Allocation: Assigning workers, equipment, and materials to specific tasks to optimize efficiency.
    3. Task Sequencing: Ensuring tasks are completed in the correct order (e.g., foundations before framing).
    4. Milestones: Setting critical project benchmarks to track progress and stay on schedule.
    5. Contingency Planning: Preparing for potential delays by building flexibility into the schedule.

Together, Wincon’s approach to staging and scheduling ensures that resources are available when needed, work areas are prepared, and the project flows efficiently, minimizing downtime and delays.

Value Engineering

Value engineering is a systematic approach used in construction and other industries to improve the value of a project by optimizing its function, quality, and cost. The goal is to achieve the best possible performance and quality for the lowest cost without compromising on key objectives. In construction, value engineering typically involves:

  1. Analysis of Project Components: Each element of the project is analyzed to determine if there are more cost-effective ways to achieve the same function or result.
  2. Alternative Solutions: Exploring alternative designs, materials, or methods that could provide equal or better performance at a lower cost.
  3. Cost Reduction: Identifying areas where costs can be reduced without sacrificing safety, performance, or quality.
  4. Function Improvement: Ensuring that any changes made to reduce cost still meet the project’s functional and performance requirements.
  5. Collaboration: Involves collaboration between designers, engineers, contractors, and the client to ensure all perspectives are considered.

The value engineering process helps optimize both short-term and long-term costs, enhance the project’s overall value, and ensure it meets the owner’s requirements within budget constraints.

Tender Packages

At WINCON, the size and scope of bid packages are meticulously reviewed to ensure competitiveness and alignment with the project’s needs.

A Typical Tender Package Includes:

  1. Invitation to Tender (ITT): A formal request inviting suppliers or contractors to submit a bid.
  2. Scope of Work (SOW): A document detailing the specific tasks, objectives, and deliverables required for the project.
  3. Bill of Quantities (BoQ): A detailed list of materials, components, and labor costs for the project.
  4. Technical Specifications: Specific technical requirements or standards that the contractor must meet.
  5. Drawings and Plans: Any blueprints, schematics, or design plans relevant to the project.
  6. Terms and Conditions: Legal and contractual terms, including payment schedules, timelines, penalties, and dispute resolution methods.
  7. Evaluation Criteria: Information on how the bids will be assessed.
  8. Form of Tender: A standardized form the bidder must complete.
  9. Contract Draft: A sample or draft version of the contract that will be signed if the bid is successful.

This package provides bidders with everything they need to submit a proposal that complies with the requirements and allows the issuing organization to evaluate bids on a common basis.

Budget Estimation

At Wincon, our approach to budget estimation is a carefully planned process that combines expertise, precision, and adaptability.

Here’s how Wincon adds its unique touch to creating a detailed budget estimate for every construction project:

  1. Preliminary Assessment: Understanding the project’s scope, location, size, and complexity.
  2. Customized Cost Breakdown Structure: Wincon breaks the project into manageable components to streamline cost allocation.
  3. Detailed, Precision-Driven Cost Estimation: Wincon calculates exact material quantities and researches competitive rates.
  4. Account for Indirect Costs: Includes overhead and general conditions.
  5. Contingency Allowance: A dedicated reserve for unforeseen circumstances.
  6. Final Review and Adjustments: Collaborating with stakeholders to ensure the budget is comprehensive and aligned with expectations.

By taking a tailored, proactive approach to budget estimation, Wincon ensures that each project starts with a clear, reliable financial framework.

Schedule Development

At Wincon, we don’t just create schedules we craft roadmaps to success. Our project scheduling process is both precise and tailored, designed to deliver your project on time, on budget, and to Wincon’s high standards. Here’s how we bring structure and finesse to every schedule:

  1. Immersing in the Project Scope:

    We start by diving into every detail, from blueprints to contracts, to capture the project’s unique vision. This deep dive reveals the full scope, objectives, and key milestones such as foundation work, structural framing, utility installations, and finishes. Every project has its own character, and we ensure the schedule reflects that.

  2. Sculpting Phases and Tasks:

    We meticulously break down the project into distinct phases: site prep, foundation, framing, roofing, MEP (mechanical, electrical, plumbing), and finishing touches. Each phase is mapped into actionable tasks, ensuring clarity at every turn. It’s all about delivering precision in every brick laid and wire installed.

  3. Sequencing for a Seamless Flow:

    Our next step is to find the rhythm in the work. We define task dependencies, identifying which steps lay the groundwork for the next. By mapping out the critical path — the essential sequence of tasks — we lock in the minimum project duration and know exactly where to focus resources to stay on track.

  4. Strategic Resource Allocation:

    Each phase demands the right resources at the right time. Wincon’s team coordinates labor, equipment, and materials down to the last detail, ensuring no crowding or downtime. Materials and equipment are lined up like clockwork, so our craftsmen and subcontractors have exactly what they need, exactly when they need it.

  5. Crafting a Living Schedule:

    Using scheduling tools like Microsoft Project, we create a digital Gantt chart that visualizes tasks, durations, and dependencies with key milestones. Buffer times are thoughtfully added, giving us room to handle unexpected challenges such as weather, inspections, or last-minute adjustments.

  6. Fostering Open Communication:

    Communication is at the heart of our process. Regular touchpoints with clients, project managers, subcontractors, and suppliers keep everyone in sync. A transparent reporting system lets us update and share progress in real-time, ensuring that everyone is always one step ahead.

  7. Securing Stakeholder Commitment:

    Once we’ve crafted the initial schedule, we bring all stakeholders — clients, architects, engineers, subcontractors — to the table. Together, we confirm roles, deadlines, and deliverable dates. By aligning commitments and fine-tuning contracts to the schedule, we lock in accountability and ensure a shared vision.

At Wincon, our scheduling isn’t just about timelines; it’s about building trust, creating flexibility, and delivering results. Each project schedule is a custom blueprint for success, allowing us to shape every project to meet our client’s highest expectations.

Special Requirements

At Wincon, we pride ourselves on being adaptable and responsive to the unique demands of each construction project. Handling special and specific requirements during a construction contract is one of our core strengths, ensuring that every client’s vision is realized without compromising on quality, timelines, or safety. Here’s how we approach and manage these distinct project needs:

  1. Initial Consultation and Requirement Gathering

    Before the contract is finalized, Wincon works closely with the client to understand any special requirements that may go beyond typical construction standards. Whether it’s bespoke architectural features, green building standards, advanced technologies, or specific safety protocols, we gather all necessary details to ensure we’re fully aligned with the client’s expectations from the start.

  2. Customized Planning and Design

    When special requirements arise, Wincon ensures that the project’s design and planning phase incorporates these needs seamlessly. We collaborate with architects, engineers, and consultants to integrate custom features into the blueprints, ensuring feasibility and cost-effectiveness. This proactive planning helps us avoid any delays or complications down the line.

  3. Sourcing Specialized Materials and Equipment

    For projects that demand unique materials—whether it’s sustainable building products, high-grade finishes, or rare components—Wincon taps into its extensive network of suppliers. We ensure that these materials are sourced without causing project delays, negotiating with vendors to lock in delivery timelines and competitive pricing. When specialized equipment is needed, we bring in trusted partners to provide the necessary tools and machinery to execute the work flawlessly.

  4. Skilled Labor for Special Requirements

    Specialized construction tasks require a skilled workforce, and Wincon ensures we have the right team in place. Whether it’s experienced craftsmen for intricate stonework, certified technicians for high-tech installations, or specialists in green building techniques, we mobilize the right people for the job. Our ability to match expertise with unique project demands ensures high-quality execution and client satisfaction.

  5. Adapting to Regulatory and Compliance Needs

    Some projects come with specific regulatory or compliance requirements—such as adhering to local building codes, environmental standards, or industry-specific safety protocols. Wincon’s team stays up-to-date with all relevant regulations and ensures that every special requirement meets or exceeds these standards. We work closely with regulatory bodies and inspectors, ensuring smooth approval processes and avoiding costly delays.

  6. Client Collaboration and Flexibility

    Throughout the project, Wincon maintains close communication with the client, particularly when dealing with special requirements. We hold regular meetings to discuss progress, review any challenges, and adjust plans if necessary. Wincon values flexibility, so if client needs shift mid-project, we have the capacity to adapt swiftly without compromising the overall schedule.

  7. Quality Assurance and Precision Execution

    Delivering on specific requirements requires an uncompromising focus on quality. Wincon implements rigorous quality control measures, ensuring that every detail—no matter how specialized—is completed to the highest standard. Whether it’s meeting tight tolerances on custom installations or ensuring the longevity of special finishes, we take a precision-driven approach to every unique element of the project.

  8. Post-Completion Support

    Even after the project is completed, Wincon remains committed to ensuring the long-term success of any special requirements. We provide detailed handover documentation, including warranties, maintenance guides, and operational instructions for any custom features or advanced systems installed during the build. Our post-completion support ensures the client is fully prepared to manage and maintain the specific aspects of the project. At Wincon, we treat every special requirement as an opportunity to showcase our expertise and commitment to client satisfaction.

Environmental Impact

At Wincon, the pre-project phase includes a thorough environmental assessment to ensure that our construction practices align with environmental regulations and sustainability goals. We evaluate potential impacts on the site, including soil conditions, water management, and local ecosystems. This proactive approach allows us to minimize environmental risks and ensure a smooth project execution, all while protecting the surrounding environment.